The Gilbert Arizona Temple is a temple of The Church of Jesus Christ of Latter-day Saints (LDS Church), in the town of Gilbert, Arizona. This structure floor area is 83000 sq ft with height of 195 ft (59m) and was built in March, 2014.
Project Name: Gilbert Arizona Temple
Location: Gilbert, AZ
Weight (Tons): 627
Structure Type: Temple
This building is designed to be sustainable in desert environment where climate conditions are harsh. Central part of the building exhibit canyon resemblance with rain harvesting system. The south elevation with metal fins act to maximise natural sunlight and reduces heat gain. This is low maintenance building with 100 years of durability. It is LEED platinum certified by the U.S. green building council.
Project Name: University of Arizona ENR2 (ENVIRONMENT AND NATURAL RESOURCES 2)
Location: Tucson, AZ
Weight (Tons): 282
Structure Type: University
PHX Sky Train© Stage 2 Construction, Rental Car Center Station: This metro Station building resembles a potato chip from bird'd eye view and its edge member is a twisted hollow tube with multi radius. There is electric people mover connects 88 gate Phoenix sky harbour international airport to Rental car centre.
Project Name: PHX Skytrain RCC
Location: Phoenix, AZ
Weight (Tons): 1091
Structure Type: Metro Station
New Wichita ballpark is a baseball park under construction in downtown Wichita, Kansas, United States. It will serve as the home ballpark of the Triple-A New Orleans Baby Cakes of the Pacific Coast League who plan to relocate to Wichita and adopt a new name for the 2020 season. Capacity: 10,000, Opened: April 2020, Construction cost: 7.5 Crores USD, Owner: Wichita Architect: DLR Group
Project Name: Wichita baseball stadium
Location: Wichita, Kansas
Weight (Tons): 1212
Structure Type: STADIUM
The Aircraft Mainntenance and Regeneration Group's newest aircraft maintenance hanger at Davis-Monathan Air Force Base is able to hold two C-130 aircraft or KC-135 cargo aircraft. This is 310 feet long with 52 foot clear overhead height, the 74,746 suare foot hanger.
Project Name: Davis Monthan Air force hanger
Location: Tucson, AZ
Weight (Tons): 910
Structure Type: Airport hanger
The Mariposa Land Port of Entry in Nogales, Arizona is one of the busiest land ports in the United States, processing over 2.8 million northbound vehicles each year. The port serves as the entry point to 37% of the produce imported to the USA from Mexico and was in need of modernisation and expansion due to the growth in trade since it was built in the 1970s. Completed in August 2014, the 55-acre site contains 270,000 GSF of buildings, inspection facilities and kennels for both south and northbound traffic. It is LEED Gold certified.
Project Name: Mariposa land Port of entry
Location: Nogales, AZ
Weight (Tons): 1821
Structure Type: Toll Plaza